Civil & Structural Works · Al Alia
Civil Works Contractor in Ajman for Excavation, Foundations and the Concrete Frame
Excavation, foundations and backfilling form the civil works stage of every building we deliver. Our engineers plan each stage from the structural drawings, and the frame rises only after each stage is checked.
11 Levels
Tallest frame delivered, Al Jurf
7
Completed buildings on record
Since 2017
Licensed and building
3 Areas
Al Alia, Al Hamidiya, Al Jurf
What civil works means here
What Our Civil Works Cover Before Your Building Rises
Civil works are the part of a building you stop seeing once it is finished: the dig, the foundations, the backfill and the reinforced concrete frame. Get them right and every floor above stays straight and dry. Get them wrong and no finish can hide it.
We don't take civil works as a separate contract. They are the first stage of every complete building we deliver, from your drawings to handover. The engineers who set out the plot stay responsible for the apartment buildings or the shops and offices that rise on it.
We are not a road or drainage contractor. As a building construction company in Ajman since 2017, working from our office off Sheikh Khalifa Bin Zayed Street, we keep our civil works inside the plot line of the buildings we build.
Civil Engineering Cadre Exam – G+ Unlimited
Society of Engineers UAE · Government of Ajman, Municipality & Planning Department · September 2025
Our civil engineer Sarmed Tariq holds the G+ Unlimited engineering classification – the grade for buildings with no limit on the number of floors.
The four stages
Four Civil Stages Every Building Goes Through
Each stage follows the structural design for your plot and is checked before the next one starts.
Earthworks and Excavation
Setting out, digging to foundation level and, once the substructure is waterproofed, backfilling and compacting. On one of our 2026 projects the earthworks covered excavation, a boulder layer, road base and backfilling.
Shoring and Groundwater Control
Where neighbours sit close, the dig is planned around their walls and the street, as on our Ground + 5 in Al Hamidiya. If the excavation meets groundwater, dewatering is planned as its own item, so you know before work starts whether your quote includes it.
Foundations Matched to the Plot
Raft or bored piles is decided by the ground investigation and the structural design, not by preference. Every pile gets an integrity test, and two working piles of each diameter are load-tested at 1.5 times their capacity. See what each option costs on real projects.
Reinforced Concrete Frame
Columns, beams and slabs rise floor by floor to the structural drawings. Where the design calls for it, slabs are post-tensioned by a specialist subcontractor, as on our Al Jurf tower and Al Hamidiya Ground + 5, for thinner slabs and longer clear spans.
On site
How the Civil Stage Runs on Site, from Setting Out to the Roof Slab
Setting Out from the Approved Drawings
Our site engineer marks the building lines and levels from the structural drawings before excavation starts.
Dig, Foundations and Waterproofing
Excavation, then the raft or pile caps, then waterproofing of the substructure (bitumen, and a two-layer membrane on pile caps) before backfilling.
Frame, Floor by Floor
Column reinforcement, then slab casting, repeated up to the roof slab, with the consultant checking each stage.
Checked Stage by Stage, Then Finishing Begins
Each stage waits for its Municipality check (what inspectors look for). Only then do blockwork, MEP and finishing start, by the same team under the same contract.
Proof, not promises
Why Owners in Al Alia and Al Jurf Trust Our Engineers with the Structure
Frames we have already delivered.
An 11-Level Frame in Al Jurf
Ground + 2 parking + 8 floors on Plot 1279: a reinforced concrete frame with post-tensioned slabs, consultant Al-Sahel Engineering Consulting Office.
Thinner slabs and longer spans gave the owner more parking and more flexible floors.
Tight Plots, Planned Digs
In Al Hamidiya, buildings sit close to their neighbours.
On Plot 1067 we planned excavation, crane work and deliveries to keep the street safe and the neighbours on side.
One Team from the Dig to Handover
On the Ground + 4 on Plot 2886 in Al Alia, our contract ran from excavation and foundations through to finishing.
So there was no gap between trades for problems to hide in.
Engineers on Site Since 2017
Owner Sarmed Tariq is a civil engineer.
Every structural decision goes back to the drawings and the consultant.
Completed buildings
Civil Works on Our Completed Buildings
Four buildings, four sets of ground and structure. Read the full story of each.
Al Jurf Tower, Plot 1279
11 levels; reinforced concrete foundations sized for the full load; post-tensioned slabs. Read the case study
Al Hamidiya Ground + 5, Plot 1067
Excavation and foundations next to neighbours; post-tension works by Premium Post Tension. Read the case study
Al Jurf Shops and Homes, Plot 0196
Excavation and foundations, then columns, beams and slabs for the ground, four floors and the roof. Read the case study
Al Alia Ground + 3, Plot 0770
Foundation and substructure, then column reinforcement and slab casting. Read the case study
26 Google reviews
Google Business Profile
Rated 5.0 by the Owners We Build For
FAQ
Questions Owners Ask About Civil and Structural Works
Straight answers from our engineers.
Do you take civil works as a separate contract?
No. Civil works are the first stage of the complete buildings we deliver, from drawings to handover. If you need excavation or foundations only, we are not the right fit.
How is the foundation type decided?
By the ground investigation and the structural design for your plot. Some plots take a raft; others need bored piles, and the structural engineer confirms which.
What happens if the dig hits groundwater?
Dewatering is planned before work starts. Check whether your quote includes it; in our experience it varies from quote to quote.
How are piles checked before the building goes up?
Every pile gets an integrity test, and two working piles of each diameter are load-tested at 1.5 times their working capacity. The consultant confirms any further tests.
Do you build post-tensioned slabs?
Yes, where the structural design calls for them. The post-tensioning is carried out by a specialist subcontractor, as on our Al Jurf tower and Al Hamidiya Ground + 5.
Do you build roads or drainage networks?
No. Our civil works stay within the plots of the buildings we build.
Get in touch
Let’s talk about your project
Visit our office in Al Alia, call or WhatsApp us, or send your plot details, and our team will get back to you with clear next steps.
Phone
+971 55 509 0396
+971 55 509 0396
info@sarmedcontracting.com
Office
Al Raeesi Building – Shop 9, Al Alia
Working hours
Sat – Thu, 7:00 AM – 10:00 PM
Request a free consultation
Tell us about your plot and project. No obligation – we’ll reply with a clear estimate.
Licensed contractor since 2017
Permits coordinated with your consultant
Villas, residential and commercial buildings