Civil Works Contractor in Ajman for Excavation, Foundations and the Concrete Frame

Excavation, foundations and backfilling form the civil works stage of every building we deliver. Our engineers plan each stage from the structural drawings, and the frame rises only after each stage is checked.

11 Levels

Tallest frame delivered, Al Jurf

7

Completed buildings on record

Since 2017

Licensed and building

3 Areas

Al Alia, Al Hamidiya, Al Jurf

What civil works means here

What Our Civil Works Cover Before Your Building Rises

Civil works are the part of a building you stop seeing once it is finished: the dig, the foundations, the backfill and the reinforced concrete frame. Get them right and every floor above stays straight and dry. Get them wrong and no finish can hide it.

We don't take civil works as a separate contract. They are the first stage of every complete building we deliver, from your drawings to handover. The engineers who set out the plot stay responsible for the apartment buildings or the shops and offices that rise on it.

We are not a road or drainage contractor. As a building construction company in Ajman since 2017, working from our office off Sheikh Khalifa Bin Zayed Street, we keep our civil works inside the plot line of the buildings we build.

G+ Unlimited Ref. SOE/AJM/GU/074

Civil Engineering Cadre Exam – G+ Unlimited

Society of Engineers UAE · Government of Ajman, Municipality & Planning Department · September 2025

Our civil engineer Sarmed Tariq holds the G+ Unlimited engineering classification – the grade for buildings with no limit on the number of floors.

The four stages

Four Civil Stages Every Building Goes Through

Each stage follows the structural design for your plot and is checked before the next one starts.

01

Earthworks and Excavation

Setting out, digging to foundation level and, once the substructure is waterproofed, backfilling and compacting. On one of our 2026 projects the earthworks covered excavation, a boulder layer, road base and backfilling.

02

Shoring and Groundwater Control

Where neighbours sit close, the dig is planned around their walls and the street, as on our Ground + 5 in Al Hamidiya. If the excavation meets groundwater, dewatering is planned as its own item, so you know before work starts whether your quote includes it.

03

Foundations Matched to the Plot

Raft or bored piles is decided by the ground investigation and the structural design, not by preference. Every pile gets an integrity test, and two working piles of each diameter are load-tested at 1.5 times their capacity. See what each option costs on real projects.

04

Reinforced Concrete Frame

Columns, beams and slabs rise floor by floor to the structural drawings. Where the design calls for it, slabs are post-tensioned by a specialist subcontractor, as on our Al Jurf tower and Al Hamidiya Ground + 5, for thinner slabs and longer clear spans.

On site

How the Civil Stage Runs on Site, from Setting Out to the Roof Slab

Setting Out from the Approved Drawings

Our site engineer marks the building lines and levels from the structural drawings before excavation starts.

Dig, Foundations and Waterproofing

Excavation, then the raft or pile caps, then waterproofing of the substructure (bitumen, and a two-layer membrane on pile caps) before backfilling.

Frame, Floor by Floor

Column reinforcement, then slab casting, repeated up to the roof slab, with the consultant checking each stage.

Checked Stage by Stage, Then Finishing Begins

Each stage waits for its Municipality check (what inspectors look for). Only then do blockwork, MEP and finishing start, by the same team under the same contract.

Proof, not promises

Why Owners in Al Alia and Al Jurf Trust Our Engineers with the Structure

Frames we have already delivered.

01

An 11-Level Frame in Al Jurf

Ground + 2 parking + 8 floors on Plot 1279: a reinforced concrete frame with post-tensioned slabs, consultant Al-Sahel Engineering Consulting Office.

Thinner slabs and longer spans gave the owner more parking and more flexible floors.

02

Tight Plots, Planned Digs

In Al Hamidiya, buildings sit close to their neighbours.

On Plot 1067 we planned excavation, crane work and deliveries to keep the street safe and the neighbours on side.

03

One Team from the Dig to Handover

On the Ground + 4 on Plot 2886 in Al Alia, our contract ran from excavation and foundations through to finishing.

So there was no gap between trades for problems to hide in.

04

Engineers on Site Since 2017

Owner Sarmed Tariq is a civil engineer.

Every structural decision goes back to the drawings and the consultant.

Completed buildings

Civil Works on Our Completed Buildings

Four buildings, four sets of ground and structure. Read the full story of each.

01

Al Jurf Tower, Plot 1279

11 levels; reinforced concrete foundations sized for the full load; post-tensioned slabs. Read the case study

02

Al Hamidiya Ground + 5, Plot 1067

Excavation and foundations next to neighbours; post-tension works by Premium Post Tension. Read the case study

03

Al Jurf Shops and Homes, Plot 0196

Excavation and foundations, then columns, beams and slabs for the ground, four floors and the roof. Read the case study

04

Al Alia Ground + 3, Plot 0770

Foundation and substructure, then column reinforcement and slab casting. Read the case study

5.0
★★★★★

26 Google reviews

Google Business Profile

Rated 5.0 by the Owners We Build For

Read Our Google Reviews

FAQ

Questions Owners Ask About Civil and Structural Works

Straight answers from our engineers.

Do you take civil works as a separate contract?

No. Civil works are the first stage of the complete buildings we deliver, from drawings to handover. If you need excavation or foundations only, we are not the right fit.

How is the foundation type decided?

By the ground investigation and the structural design for your plot. Some plots take a raft; others need bored piles, and the structural engineer confirms which.

What happens if the dig hits groundwater?

Dewatering is planned before work starts. Check whether your quote includes it; in our experience it varies from quote to quote.

How are piles checked before the building goes up?

Every pile gets an integrity test, and two working piles of each diameter are load-tested at 1.5 times their working capacity. The consultant confirms any further tests.

Do you build post-tensioned slabs?

Yes, where the structural design calls for them. The post-tensioning is carried out by a specialist subcontractor, as on our Al Jurf tower and Al Hamidiya Ground + 5.

Do you build roads or drainage networks?

No. Our civil works stay within the plots of the buildings we build.

Get in touch

Let’s talk about your project

Visit our office in Al Alia, call or WhatsApp us, or send your plot details, and our team will get back to you with clear next steps.

Request a free consultation

Tell us about your plot and project. No obligation – we’ll reply with a clear estimate.

Thank you! Your request has been sent. Our team will get back to you shortly.

Licensed contractor since 2017

Permits coordinated with your consultant

Villas, residential and commercial buildings

Contact details

+971 55 509 0396

info@sarmedcontracting.com

Al Raeesi Building, Shop 9
Al Alia, Ajman, United Arab Emirates

Free consultation

Book a Free Consultation

Tell us about your plot and what you want to build. Our engineers will call you back with a clear next step.