Soil Investigation for Buildings in Ajman: What the Soil Reports Found and What They Changed

What our 2026 soil reports found, from groundwater to salty ground, and how each finding changed the foundations and the concrete.

Have a question? Message us on WhatsApp
By Sarmed Tariq • Updated November 23, 2026 • 9 min read

On our piled Al Jurf plot, the soil report found groundwater 11.6 m below working level. It also flagged high sulphate and chloride in the ground. Nobody could see any of that from the street.

The structural drawings responded. They called for 16 m bored piles, coated steel and concrete made for sulphate exposure. Before a single column was drawn, the soil had already shaped the building.

Here is the short answer on the soil investigation report in Ajman. An accredited lab drills boreholes and tests the ground. Its report gives the soil layers, bearing capacity, groundwater and soil chemistry, and recommends a foundation. Your structural engineer designs from it. The municipality wants it in the permit file and, as a final report, with the structural drawings.

In this guide, you will find:

  • What a soil investigation report is, and when you need one.
  • What the soil reports on our 2026 projects found, and how the designs responded.
  • How groundwater and salty soil change the foundations and the concrete.
  • What to ask the lab before the drilling starts.

Everything below comes from the structural drawings we priced in 2026, with names and plot numbers removed. We have worked as a building construction company in Ajman since 2017.

What Is a Soil Investigation Report in Ajman?

It is a lab’s study of the ground under your plot. The lab drills boreholes, takes samples and tests them. The report sets out the soil layers, the bearing capacity, the groundwater level and the soil chemistry. It ends with a recommended foundation type for your building.

Owners often call it a soil test. The drawings call it the soil report or the geotechnical investigation. On the drawings we priced, the foundation notes refer straight to it. Two sets say the water table and bearing capacity are taken from the soil report.

Soil investigation report: card showing a borehole column of soil layers with five labels: layers, bearing capacity, groundwater, soil chemistry and foundation advice

When Do You Need a Soil Test in Ajman?

Before the structural design starts. The building permit checklist asks for a soil report from an accredited lab in Ajman. The 2026 structural checklist also asks for the final soil investigation report. The engineer cannot size the foundations without it.

So order it early, once your consultant has the plot layout. Our guide to the building permit for a residential building lists all 27 documents. Our guide to Ajman’s structural submission rules explains the word “final”.

Who Arranges and Pays for the Soil Report?

You pay for it, as the owner. Your consultant usually arranges it with the lab and uses it for the design. It is not part of the building contract. The soil report sat outside all three of our 2026 quotes, along with the consultant’s fees.

Ask your consultant to include it in their scope, or to name the lab. Our guide to costs not in your contractor’s price lists the other items outside the quote. Our guide to the engineering consultant and building contractor explains who does what.

What Did the Soil Reports on Our Projects Find?

Different ground on each plot. Two of our three 2026 drawing sets ended up on bored piles, and one on a raft. The piled sets flagged high sulphate and chloride. One recorded groundwater 11.6 m below working level. Each finding has a matching answer in the drawings.

What the soil report foundWhat the drawings did about it
Foundation design (two plots)Bored piles, 14 to 16 m long
Pile capacity for a 50 cm pile1,577 kN working load, 806 kN pull-out
High sulphate and chloride (piled plots)Protective coating, sulphate-class concrete, epoxy-coated steel on one set
Groundwater 11.6 m below working levelDig of about 2.1 m, well above the water
Bearing capacity and water table (raft plot)Raft 90 to 120 cm thick, coated below the water table

Source: foundation notes and pile schedules on three structural drawing sets we priced in 2026.

None of these numbers will match your plot. That is the point of a soil investigation report.

How Did the Soil Report Decide Piles or a Raft?

The engineer chose from the report. Where the ground needed it, the design used bored piles 14 to 16 m long. Where the bearing capacity allowed, it used a raft. The owner and the contractor did not choose. The soil and the building’s loads did.

The choice moves the budget a lot. In our quotes, the piled foundations came to AED 293 to 445 per m² of built-up area. The raft came to about AED 284. Our foundation cost guide compares the two in detail.

Piles also need tests on site. The drawings asked for a load test on two working piles of each diameter. Every pile also gets an integrity test.

Ground section of a piled plot: a dig of about 2.1 m, piles 16 m deep and groundwater 11.6 m below working level

How Does Groundwater Change the Job?

It decides whether the dig needs pumping. On our piled Al Jurf plot, the report found water 11.6 m below working level. The dig was only about 2.1 m deep, so it stayed well clear. A higher water table can mean dewatering, and extra protection for the concrete below it.

Both our Al Jurf quotes still left any dewatering to the owner. That time counts as a “dead period”. Our guide to the building construction timeline explains how it works. Our Al Nuaimia quote included dewatering at a fixed AED 100,000.

On two of our sets, concrete below the water table gets bitumen and two membrane layers. On the piled Al Jurf set, nearby buildings meant sheet pile walls to hold the dig.

What Does Salty Soil Mean for the Concrete?

More protection below ground. All three of our sets used sulphate-resisting concrete below plinth level. Where the report flagged high sulphate and chloride, the piles got a protective coating. One piled set also called for epoxy-coated pile steel. That keeps the salts from attacking the concrete and steel.

A good soil investigation report tests for salts, so the concrete can be specified before anything is cast. Our guide to the building construction cost breakdown shows how the frame and foundations add up.

What Must the Report Include?

The 2026 structural checklist sets the list. At least 3 boreholes for every 900 m². The soil layers and their properties, bearing capacity and pile capacities. Groundwater depth and its seasonal changes, settlement, the seismic zone and the dewatering needs. A clear foundation recommendation closes it.

  • Borehole count and depth
  • Soil layers and classification
  • Bearing capacity, and pile capacities where piles are likely
  • Groundwater depth and seasonal changes
  • Settlement, seismic zone and excavation advice
  • Foundation recommendation

Our guide to Ajman’s structural submission rules covers the full checklist.

What Should You Ask the Lab Before Testing?

Five questions. Is the lab accredited in Ajman? Will it drill at least 3 boreholes for every 900 m²? Will the boreholes go deep enough for piles, if they are likely? Will it test groundwater and soil chemistry? And will it issue a final report your engineer can submit?

Send the lab your consultant’s plot layout and the planned number of floors. A taller building puts more load on the ground, so the investigation must suit it.

Checklist of five questions to ask a soil lab, from accreditation in Ajman to a final report for the engineer

What Happens if the Ground on Site Differs From the Report?

The site engineer deals with it. Our drawings say that any very weak layer found during excavation is removed. It is replaced with well-graded, salt-free granular fill. The new fill is compacted in layers and tested to 95 to 98% of its maximum dry density.

The contractor carries out those compaction tests. Our raft quote also priced a boulders and cobbles layer and two road base layers as standard earthworks. That kind of work is part of the civil works stage of a building.

Frequently Asked Questions

Do I need a soil test to build in Ajman?

Yes. The building permit file asks for a soil report from an accredited lab in Ajman.

What does a soil investigation report include?

Borehole logs, soil layers, bearing capacity, pile capacities, groundwater, settlement, the seismic zone and a foundation recommendation.

How many boreholes are needed?

The 2026 structural checklist asks for at least 3 boreholes for every 900 m².

Who pays for the soil report?

The owner. It sat outside all three of our 2026 contractor quotes. Your consultant usually arranges it.

Does the soil report decide piles or a raft?

It guides the choice. The structural engineer designs the foundation from it.

What did the soil reports on your projects find?

Two designs used bored piles 14 to 16 m long. Those plots had high sulphate and chloride. One plot had groundwater 11.6 m below working level.

What is sulphate-resisting cement for?

It protects concrete in the ground from sulphate attack. All three of our sets used it below plinth level.

Do I always need dewatering?

No. It depends on the groundwater level and the depth of the dig. The soil report gives both.

What if the ground on site is weaker than expected?

Weak layers are dug out and replaced with salt-free granular fill, compacted and tested.

Can you review my soil report?

Yes. Send it with your drawings, and we will explain what it means for the foundations and the price. Use our contact page or WhatsApp.

So, What Will Your Soil Report Say?

Nobody knows until the boreholes are drilled. That is why the soil investigation report comes first. It sets the foundation type, the concrete specification and part of the budget.

Remember the piled Al Jurf plot. Water 11.6 m down, salts in the ground and 16 m piles to answer them. Your plot will tell its own story.

Planning a building? See our residential building construction and commercial building services. Our approvals and permits service can follow the file with your consultant. Permit services are listed on the Ajman Municipality e-services portal.

Already have a soil report? Send it to us on WhatsApp, and we will tell you what it means for your building.

Build with confidence

Ready to start your project in Ajman?

From Ajman Municipality approvals to handover, our licensed team manages every step. Share your plot and plans and we’ll give you a clear estimate.

Get in touch

Let’s talk about your project

Visit our office in Al Alia, call or WhatsApp us, or send your plot details, and our team will get back to you with clear next steps.

Request a free consultation

Tell us about your plot and project. No obligation – we’ll reply with a clear estimate.

Thank you! Your request has been sent. Our team will get back to you shortly.

Licensed contractor since 2017

Permits coordinated with your consultant

Villas, residential and commercial buildings

Contact details

+971 55 509 0396

info@sarmedcontracting.com

Al Raeesi Building - Shop 9 - Al Alia - Ajman

Free consultation

Book a Free Consultation

Tell us about your plot and what you want to build. Our engineers will call you back with a clear next step.

Thank you! Your request has been sent. Our team will get back to you shortly.

Prefer to talk? Call +971 55 509 0396 or WhatsApp us